Edinburgh Waverley Station

Client
Story Contracting
Scope
Station Information & Surveillance System
GRIP Stage
5, 7
Role & Responsibility
Telecoms Designer and CRE Design
Cadoxton Station
What we did:
MRC Engineering were intially engaged by Story Contracting to undertake As-Built Design and CAD production following the collapse of Carillion and the loss of their Telecoms Contractor Opitlan. The scheme grew into MRC Engineering undertaking a new CCTV Gateline design for Platform 12.
Project Overview:
-
GRIP 5 Detailed Design for the Platform 5 CCTV Design
-
GRIP 7 As-Bults for the Full SISS Design on Edinburgh Waverley. This included the creation of new models based solely on PDF designs. This included, CCTV Relocations, CCTV Node Relocations and PA Enhancement
Project key deliverables / challenges:
-
Production of editable files in a condensed time scale to allow the completion of Edinburgh waverley and final handback to Network Rail